Project Management
A complete list of parts used on the final robot design was created to document the total cost. Further details are provided at the link to the right.
|
A project log book was maintained which details roughly how and when work was completed, along with when deadlines were. Details are provided at the link to the right.
|
During the first two weeks of the project, a lot of design ideas were considered before a final design was decided on. The link to the right presents all of the ideas discussed.
|
Takeaways from this project are documented at the link to the right.
|